A written plan for leading-edge, precast and residential work where conventional systems are infeasible.
29 CFR 1926.502(k)
Printable checklists, permits and logs for the person who has to sign them — each one carrying the 29 CFR section it answers to, and every figure read from the standard itself.
16 tools · 18 guides · 6 comparisons · sources dated on every page

Every tool prints. Every tool carries its governing section. Nine of 16 below.
A written plan for leading-edge, precast and residential work where conventional systems are infeasible.
29 CFR 1926.502(k)
Pre-use inspection for full-body harnesses, lanyards and connectors, point by point.
29 CFR 1926.502(d)(21)
Competent-person inspection before each shift, printable and dated.
29 CFR 1926.451(f)(3)
Portable and fixed ladder checks, angle rule and defect tagging.
29 CFR 1926 Subpart X
A fillable log of work-related injuries and illnesses with case classification built in.
29 CFR 1904.29
Total recordable incident rate from your case count and hours worked, with a benchmark read.
29 CFR 1904.32
Capture the close call before it becomes a recordable, in one page.
Voluntary — no OSHA form
First-report form for a jobsite injury, with witness and root-cause sections.
29 CFR 1904.29(b)(2)
Break a task into steps, name each hazard, and record the control before the crew starts.
OSHA 3071 (guidance)
01
Every page opens with the section that creates the obligation — 1926.501, 1904.7, 1910.147 — quoted, not paraphrased.
02
Fill it in the browser, print it, or copy it out. Nothing asks for an email address and nothing is stored.
03
Each page prints the URL and the fetch date of every source it used, so you can see how fresh the figure is.

4 tools · 4 guides · 2 comparisons

4 tools · 5 guides · 1 comparisons

4 tools · 5 guides · 1 comparisons

4 tools · 4 guides · 2 comparisons
Every one of the 16 tools runs in the browser and prints from it. No account, no download gate, no newsletter. Bookmark the one your crew needs on Monday.